What a Feasibility Study Should Actually Contain
Why Output Estimates Matter
A feasibility study is only as good as the numbers behind it. On british-hydro.co.uk we see too many reports that promise a certain kilowatt figure without showing how it was reached. A trustworthy study breaks the output estimate into its parts: head, flow, turbine efficiency and availability. Each figure should be sourced, whether from a flow gauging record, a manufacturer curve or a site survey.

Ask for a table of seasonal flow variation rather than a single annual average. A river that runs high in winter and low in summer will not deliver a flat output, and the study must say so. The estimate should also state its confidence range, for example a central figure with a low and high case.
Cost Projections That Hold Up
Capital costs are where optimism creeps in. A solid study separates civil works, mechanical and electrical equipment, grid connection and professional fees. It should show contingency as a visible line item, not hide it inside other totals.
- Civil works: intake, channel, powerhouse and access
- Equipment: turbine, generator, controls and switchgear
- Grid connection: cabling, protection and utility charges
- Consents and professional fees
Running costs deserve equal attention. Include insurance, maintenance, business rates and a sinking fund for major overhauls. Then present lifetime cost projections alongside expected revenue, so the reader can see payback and sensitivity to price changes.
Environmental Checks and Consents
Environmental checks are not a formality. The study should identify protected species, water quality designations and any impact on fish passage. It should list the consents required and the likely timeline for each.
“A feasibility study that ignores environmental constraints is a business plan, not an assessment.”
Look for a clear statement of residual risks and how they will be managed. A study that admits uncertainty is more trustworthy than one that claims none.
Reading the Numbers Together
Output, cost and environmental findings must connect. A higher output may require a larger intake, which raises civil costs and environmental scrutiny. The study should show these trade-offs explicitly.
| Area | What to check | Red flag |
|---|---|---|
| Output | Seasonal flow data and efficiency assumptions | Single annual average only |
| Costs | Contingency and lifetime running costs | No sensitivity analysis |
| Environment | Consents list and mitigation measures | Constraints left unmentioned |
Use this table as a checklist when commissioning or reviewing a report. If all three areas are transparent, the study is worth trusting.
The Bottom Line
A feasibility study should let a reader follow the logic from site data to output, from output to cost, and from cost to a financial decision. Insist on sourced figures, visible assumptions and honest risk statements. That is what separates a credible assessment from a sales document.