British-hydro

Blog

Articles and project news on small-scale water power, written for people planning their first scheme.

About this blog

What we publish here

This blog records what we learn while planning, permitting and building small hydro schemes. Posts are written after the work is done, so that the figures, drawings and mistakes described are those that were actually encountered on site.

Articles follow the same sequence as the guide itself: site assessment, design, permits, construction and operation.

Topics

River flowing past a weir

Site assessment

Reports on flow measurement, head surveys and the choice between run-of-river and storage layouts.

Permits and approvals

Documents spread on a table beside a site plan

Applications and conditions

Notes on abstraction licences, environmental conditions and how they shape the design before construction begins.

Build and operation

Turbine housing during installation

Construction and upkeep

Accounts of installation, commissioning tests, and the routine checks that keep a scheme running through each season.

Publishing schedule

New articles are added to this listing as they are reviewed. Each post names the stage of the guide it supports, so readers can move between the blog and the step-by-step pages.

Published articles will appear below this introduction. Until then, the step-by-step pages are the best place to start.

Start with the service stages, read the common questions, or get in touch.

Articles