Every stage of the mini-hydro guide, arranged in the order you will need them.

Section 01

How this guide is arranged

The guide is written as a sequence. Each stage depends on the one before it, so reading out of order usually means repeating work. The pages below show that sequence and the main decisions at each point.

Start with the resource assessment and move on only when the flow and head figures are settled.

Surveyor measuring water depth at a river bank
Section 03

Sequence at a glance

Step 1

Resource assessment

Measure flow over several seasons and estimate the usable head.

Step 2

Layout and outline design

Place the intake, pipeline, and powerhouse to limit losses and civil costs.

Step 3

Equipment selection

Match the turbine type to the head and flow range found in step one.

Step 4

Permits and connection

Agree abstraction and discharge consents and confirm the grid connection route.