Sizing a Generator for Part-Load Efficiency
Why Part-Load Efficiency Beats Peak Output-britiad
When specifying a hydro generator, it is tempting to focus on the maximum kilowatt figure on the datasheet. That number looks impressive in a proposal, but it rarely reflects how the machine will actually run. A river is not a constant resource. It swells after rain, drops in dry spells, and spends most of the year somewhere between those extremes. Sizing a generator for part-load efficiency means accepting this reality and designing around it.

British Hydro works with sites where flow varies dramatically across the seasons. A turbine rated for a once-in-five-years flood may operate at less than thirty percent of its capacity for months on end. At that point, efficiency losses, poor power factor, and mechanical wear become the real story, not the headline output figure.
Understanding the Part-Load Curve-britiad
Every generator has an efficiency curve. It rises steeply from zero, peaks near its rated load, and then falls away again. If your site spends most of its time at the lower end of that curve, you are converting water into heat and noise rather than electricity. The same principle applies to the turbine, the gearbox, and the control system.
Consider two common scenarios:
- A high-head site with a small, steady stream that rarely exceeds ten litres per second.
- A low-head site on a river that floods in winter and trickles in summer.
In both cases, a generator chosen for peak flow will be oversized for the majority of operating hours. The result is low part-load efficiency, higher maintenance, and a longer payback period.
Matching Capacity to Real River Flows-britiad
The correct approach is to build a flow duration curve for your site. This shows how many days per year each flow rate is equalled or exceeded. You then size the generator so that its best-efficiency point sits near the flow you expect most often, not the flow you hope for.
A practical method follows these steps:
- Record river flow data for at least twelve months, or use a nearby gauging station.
- Plot the flow duration curve and identify the median and lower quartile flows.
- Calculate the hydraulic power available at those flows.
- Select a generator whose rated capacity is close to the power available at the median flow.
- Check that the generator can still handle higher flows without excessive overspeed or cavitation.
This sequence often leads to a smaller, cheaper, and more reliable machine than a peak-chasing design.
Comparing Peak and Part-Load Sizing-britiad
The table below shows how the two philosophies differ in practice. The figures are illustrative, but the pattern is common across British rivers.
| Parameter | Peak-Sized Generator | Part-Load-Sized Generator |
|---|---|---|
| Rated capacity | 15 kW | 7 kW |
| Typical operating load | 25 percent | 70 percent |
| Efficiency at typical load | 58 percent | 84 percent |
| Annual energy yield | Lower | Higher |
| Capital cost | Higher | Lower |
As the table suggests, a smaller generator running near its sweet spot can outproduce a larger one that spends its life idling.
The Economics of Real Flows-britiad
Part-load efficiency is not just an engineering nicety. It determines whether a hydro scheme pays for itself. Oversizing increases the cost of the turbine, generator, penstock, and electrical protection, while reducing the energy actually sold or used on site.
"A generator that runs at its best efficiency for most of the year will almost always beat one that only shines during a flood."
That principle should guide every sizing decision. Chasing peak output figures may satisfy a spreadsheet, but matching capacity to real river flows satisfies the river, the budget, and the long-term energy yield.